Testing Results

DOT ROAD BASE MARCH 2023 

County Road Base May 2023 

 

Non-tested material: 
57 Crushed Concrete
Concrete Rip Rap
Asphalt Millings (4 inch minus)
Crushed Asphalt (1.5 inch minus)

Please call for questions – 877-563-7625