1.877.563.ROCK
Aggregates
Test Results
Rolloff
Order Material
Forms
Connect
Safety
Calculator
Transportation
SALES HELP
ONLINE HELP
In The Community
KCC Manifest
KIMMINS MANIFEST
PULL DATE:
(Required)
MM slash DD slash YYYY
SELECT KCC JOB:
Choose job for invoice
52201 LOWER PEN AVERILL BAYSHORE MACDILL
51906 CHANNELSIDE GMP 2
52202 WATERSTREET
82523 THEA MERIDIAN RR DEMO
KCC JOB - PHASE
If your job is not listed in drop down.
MATERIAL:
(Required)
C-30 Bedding Stone
C-32 Bank & Shore
C-33 Ditch Lining
DOT B-12 Concrete Road Base 1.5" Minus
Concrete Road Base 1.5" Minus
#57 Recycled Concrete 1.5"
#4 Ballast Recycled Concrete
Concrete Fines 3/8 Minus
Rip Rap 6-12 Inch
Rip Rap 12-18 Inch
#89 DOT Limestone
#57 DOT Limestone
Premium Crushed Asphalt (Screened)
Asphalt Millings 4" Minus
DOT Coarse Underdrain
Underdrain Sand
Screened Recycled Dirt
#LOADS/TONS:
(Required)
Run all day.
1
1-3
3-5
5-9
9-11
11 +
Other - see comments.
APPROVED BY:
(Required)
Dan Segale
Loyd Ealy
Candice Agosto
Winnie Jackson
Other - Enter info in comments.
Material availability confirmed with.
ORDERED BY:
(Required)
Email
(Required)
COMMENTS:
Please add any details we need to know regarding your order.